Black Dog Wearâ„¢ Long Lead 5m

Price range: $36.00 through $40.00

  • 5 Metres long with snaphook and handle.
  • 12mm or 20mm width.
  • Lightweight.
  • Great lead for scent work.

loader-image
$48.00

Select options This product has multiple variants. The options may be chosen on the product page

Zogoflex Toppl filled
Price range: $35.33 through $55.79

Select options This product has multiple variants. The options may be chosen on the product page

Faux Fur Pocket Bungee Squeaker by Tug E Nuff in Purple
$44.00

Select options This product has multiple variants. The options may be chosen on the product page

Licky Mats Navy Khaki Butterscotch
$8.00

Select options This product has multiple variants. The options may be chosen on the product page

$69.99

Select options This product has multiple variants. The options may be chosen on the product page

$10.00
Zogoflex Bumi multicolours
Price range: $30.68 through $39.98

Select options This product has multiple variants. The options may be chosen on the product page

Original price was: $79.99.Current price is: $65.00.

Select options This product has multiple variants. The options may be chosen on the product page

$48.00

Select options This product has multiple variants. The options may be chosen on the product page

$11.50
$20.00
Dog chewing rainbow toy
Price range: $15.00 through $29.00

Select options This product has multiple variants. The options may be chosen on the product page

$45.95
Price range: $34.00 through $52.00

Select options This product has multiple variants. The options may be chosen on the product page

Price range: $37.20 through $46.50

Select options This product has multiple variants. The options may be chosen on the product page

The ideal tool for training dogs and puppies for Recall,or allowing dogs to roam in the park, or the beach, while still maintaining lead control.

An excellent light weight long lead that enables the dog to learn recall without the weight of a heavy lead.

Width: 12mm or 20mm wide webbing, Regular snaphook.

Additional information

Weight 0.18 kg
Dimensions 40 × 3.5 × 2 cm
Width

Regular (20mm), Mini (12mm)

Colour

Blue, Black, Orange, Purple, Pink

2 reviews for Black Dog Wearâ„¢ Long Lead 5m

  1. Karen E.

    Fantastic quality lead which runs smoothly through the hand. Well recommended

  2. JOHN ELLIS

    very fast delivery, leash is great, good webbing nice and soft and doesn’t burn the hand when the webbing is pulled thru fingers at speed unlike the cheaper nylon leash from china.

Add a review

Your email address will not be published. Required fields are marked *

Q & A

Ask a question
Black Dog Wearâ„¢ Long Lead 5m Black Dog Wearâ„¢ Long Lead 5m
Your question
* Question is required
Name
* Name is required
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
There are no questions yet
error: Content is protected !!