Black Dog Wear™ Long Lead 5m
$36.00 – $40.00
- 5 Metres long with snaphook and handle.
- 12mm or 20mm width.
- Lightweight.
- Great lead for scent work.
The ideal tool for training dogs and puppies for Recall,or allowing dogs to roam in the park, or the beach, while still maintaining lead control.
An excellent light weight long lead that enables the dog to learn recall without the weight of a heavy lead.
Width: 12mm or 20mm wide webbing, Regular snaphook.
Additional information
Weight | 0.18 kg |
---|---|
Dimensions | 40 × 3.5 × 2 cm |
Width | Regular (20mm), Mini (12mm) |
Colour | Blue, Black, Orange, Purple, Pink |
1 review for Black Dog Wear™ Long Lead 5m
Q & A
Ask a question

Your question
* Question is required
Name
* Name is required
Email
* Email is required
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
There are no questions yet
Karen E. –
Fantastic quality lead which runs smoothly through the hand. Well recommended