Black Dog Wear™ Long Lead 5m

$36.00$40.00

  • 5 Metres long with snaphook and handle.
  • 12mm or 20mm width.
  • Lightweight.
  • Great lead for scent work.

loader-image
$4.00

Select options This product has multiple variants. The options may be chosen on the product page

Dogs Best Friend Game
$59.99
$29.99
$10.00
$8.00

Select options This product has multiple variants. The options may be chosen on the product page

Orbee Tuff Mazee Orange
$38.00

Select options This product has multiple variants. The options may be chosen on the product page

$47.00

Select options This product has multiple variants. The options may be chosen on the product page

$45.95
$28.00
Zogoflex Toppl filled
$35.33$55.79

Select options This product has multiple variants. The options may be chosen on the product page

$49.00

Select options This product has multiple variants. The options may be chosen on the product page

$34.00$52.00

Select options This product has multiple variants. The options may be chosen on the product page

$85.00

Select options This product has multiple variants. The options may be chosen on the product page

The ideal tool for training dogs and puppies for Recall,or allowing dogs to roam in the park, or the beach, while still maintaining lead control.

An excellent light weight long lead that enables the dog to learn recall without the weight of a heavy lead.

Width: 12mm or 20mm wide webbing, Regular snaphook.

Additional information

Weight 0.18 kg
Dimensions 40 × 3.5 × 2 cm
Width

Regular (20mm), Mini (12mm)

Colour

Blue, Black, Orange, Purple, Pink

Reviews

There are no reviews yet

Be the first to review “Black Dog Wear™ Long Lead 5m”

Your email address will not be published. Required fields are marked *

error: Content is protected !!