Black Dog Wear™ Long Lead 5m

$36.00$40.00

  • 5 Metres long with snaphook and handle.
  • 12mm, 20mm or 25mm width.
  • Lightweight.
  • Great lead for scent work.

loader-image
Original price was: $58.00.Current price is: $45.00.
$47.00

Select options This product has multiple variants. The options may be chosen on the product page

$30.00
Orbee Tuff Mazee Orange
$38.00

Select options This product has multiple variants. The options may be chosen on the product page

Two dogs on splash pad
$25.00$40.00

Select options This product has multiple variants. The options may be chosen on the product page

$90.00$95.00

Select options This product has multiple variants. The options may be chosen on the product page

$49.00
$29.99
Zogoflex Toppl filled
$35.33$55.79

Select options This product has multiple variants. The options may be chosen on the product page

$8.00

Select options This product has multiple variants. The options may be chosen on the product page

$45.95
$34.00$52.00

Select options This product has multiple variants. The options may be chosen on the product page

$49.00

Select options This product has multiple variants. The options may be chosen on the product page

The ideal tool for training dogs and puppies for Recall,or allowing dogs to roam in the park, or the beach, while still maintaining lead control.

An excellent light weight long lead that enables the dog to learn recall without the weight of a heavy lead.

Width: 12mm, 20mm or 25mm wide webbing, Regular snaphook.

Additional information

Weight 0.18 kg
Dimensions 40 × 3.5 × 2 cm
Colour

Blue, Black, Orange, Purple, Pink

Width

Mini (12mm), Small (20mm), Regular (25mm)

Reviews

There are no reviews yet

Be the first to review “Black Dog Wear™ Long Lead 5m”

Your email address will not be published. Required fields are marked *

error: Content is protected !!